Glossary

  • A
  • B
  • C
  • D
  • E
  • F
  • G
  • H
  • I
  • J
  • K
  • L
  • M
  • N
  • O
  • P
  • Q
  • R
  • S
  • T
  • U
  • V
  • W
  • X
  • Y
  • Z

BOQ (Bill of Quantities)

An itemized contract document featuring all the materials and workmanship used to help price out the project.

Blueprints

A 2-dimensional technical drawing that has all of the project s details.

Blocking

A construction technique to join, fill or reinforce the building structure.

Building information modeling (BIM)

Involves creating a computer model of a building, including details of that structure from its basic layout to the smallest measurements.

Bid

Price proposal typically based on the design specification and documents.

Best Value Method

A construction procurement method where contractors are awarded the bid based on prices and quality measurements from previous work performance.

Back charge

Money held back or charged to a contractor after a project ends to cover the cost of an expense, damage, or incomplete work.